Lean Distribution untuk Minimasi Keterlambatan Pengiriman Produk Susu
Abstract
The aim of this research is to determine the causes of delays in the delivery of products to consumers. Big picture mapping will describe the product delivery process flow starting from receiving product delivery orders to the product delivery process carried out by a third party company. Process activity mapping is used to categorize activities into three categories, namely value added, necessary, value added, and non value added. Waste activity identification that occurs in the product delivery process is carried out with the seven waste method, which then causes the waste factors to be analyzed using a fishbone diagram. Lean distribution method is useful for analyzing waste factors as much as possible, so that continuous improvement can be implemented immediately.
Keywords
Full Text:
PDFReferences
Batubara, S., & Halimuddin, R. A. 2016. Penerapan Lean Manufacturing Untuk Meningkatkan Kapasitas Produksi Dengan Cara Mengurangi Manufacturing Lead Time Studi Kasus: Pt Oriental Manufacturing Indonesia. Penelitian Dan Karya Ilmiah, 1(1), 49-56.
Damsar. 2009. Pengantar Sosiologi Ekonomi. Jakarta : Kencana.
Endrawati, T., & Siregar, M. T. (2018, March). Analysis of logistic distribution performance of good supply from PT. Mentari Trans Nusantara distribution center to branches using Smart PLS 3.0. In AIP Conference Proceedings (Vol. 1941, No. 1, p. 020007). AIP Publishing.
Fernando, Y. C., & Noya, S. 2014. Optimasi lini produksi dengan value stream mapping dan value stream analysis tools. Jurnal Ilmiah Teknik Industri, 13(2), 125-133.
Gaspersz, Vincent. 2008. Lean Six Sigma. Jakarta : PT. Gramedia Pustaka Utama
Hanggraeni, Dewi. 2014. Manajemen Risiko Perusahaan Terintegrasi Berbasis ISO 31000. Jakarta:UI Press
Hartini, S., Saptadi, S., Kadarina, N., & Rizkya, I. 2009. Analisis Pemborosan Perusahaan Mebel Dengan Pendekatan Lean Manufacturing (Studi Kasus PT “X” Indonesia). J@ ti Undip: Jurnal Teknik Industri, 4(2), 81-90.
Haryono, & Muliaari, L. 2016. Analisis Faktor Penyebab Keterlambatan Pengiriman Produk Arnotts. Jurnal Manajemen Bisnis Transportasi dan Logistik.
Hines, P and Taylor, D. 2000. Going Lean. UK : Lean Enterprise Research Centre.
Kusnadi, E. 2011. Fishbone Diagram dan Langkah-langkah Pembuatannya, 10(1), 1-10.
Martoni, Ricky. 2015. Manajemen Logistik Terintegrasi. Jakarta : PPM.
Nasution, M. N. 2005. Manajemen Mutu Terpadu: Total Quality Management, Edisi Kedua, Ghalia Indonesia, Bogor
Siahaya, Willem, 2013, Sukses Supply Chain Management, Jakarta: In Media.
Siregar, M. T., & Puar, Z. M. 2018. Implementasi Lean Distribution Untuk Mengurangi Lead Time Pengiriman Pada Sistem Distribusi Ekspor. Jurnal Teknologi, 10(1), 1-8.
Soetjitro, P. 2010. Instrumen total quality management (TQM) sebagai pilihan alat pengendalian. Value Added: Majalah Ekonomi dan Bisnis, 6(2).
Zylstra, Krik D. 2006. Lean Distribution : Menciptakan Jalur Distribusi yang Ramping, Logistik, dan Supply Chain yang Ramping, Hemat Biaya, Efektif dan Responsive Terhadap Kebutuhan Pelanggan. Jakarta : PPM
DOI: http://dx.doi.org/10.54324/j.mtl.v5i3.272
Refbacks
- There are currently no refbacks.
Copyright (c) 2019 JURNAL MANAJEMEN TRANSPORTASI & LOGISTIK
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Jurnal Manajemen Transportasi & Logistik (JMTRANSLOG) is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.