Ketepatan Waktu dan Okupansi Terhadap Kinerja Kereta Api Joglosemarkerto

Authors

  • Usri Jati Hastuti Institut Transportasi dan Logistik Trisakti, Jakarta
  • Masjraul Hidayat Institut Transportasi dan Logistik Trisakti, Jakarta
  • M. Iqbal Firdaus Institut Transportasi dan Logistik Trisakti, Jakarta

DOI:

https://doi.org/10.54324/j.mbtl.v6i2.522

Keywords:

load factor, on-time performance, rail transport

Abstract

The purpose of the study are to analyse the train’s punctuality and load factor and to verify the effect of the train’s punctuality to its load factor. The study is about the Joglosemarkerto rail transport for 62 days or 2 months from December 2018 to Januari 2019. The data used in this study was a secondary data based on the delay and load factor of daily departure of the rail transport. The data analysis were using two techniques which were descriptive quantitative and linear regression. The result shows that the negative effect of punctuality to load factor due to the delay that giving negative effect to the load factor. The equation from the effect of punctuality to load factor was shown in Y = 310,790 – 1,630X.

References

Adika, W., & Osly, P. J. (2018). Analisis Kinerja Operasional Kereta Api Jurusan Jakarta-Purwakarta (Studi Kasus Kereta Api Walahar Ekspres dan Cimalaya Ekspres). Indonesian Journal of Construction Engineering and Sustainable Development, 1(1), 36–44.

Asikin, M. Z. (2001). Sistem Manajemen Transportasi Kota. Yogyakarta. Yogyakarta: Abhiseka.

Goverde, R.M.P. (2005). Punctuality of Railway Operations and Timetable Stability Analysis (Thesis). Delft, Belanda: Delft University of Technology.

[Kemenhub RI] Kementerian Perhubungan Republik Indonesia. 2002. Keputusan Direktur Jenderal Perhubungan Darat Nomor SK.687/AJ.206/DRJD/2002 Tahun 2002 Tentang Pedoman Teknis Penyelenggaraan Angkutan Penumpang Umum di Wilayah Perkotaan dalam Trayek Tetap dan Teratur. Jakarta.

Kharissa, K.V., & Widyastuti, H. (2013). Evaluasi Kinerja Angkutan Umum (Bis) Patas dan Ekonomi Jurusan Surabaya-Malang. Jurnal Teknik POMITS, 1(1), 1–6.

Manik, P., & Suwarlan, I. (2015). Pengaruh Jumlah Bus Siap Operasi dengan Jumlah Penumpang Diangkut pada PT Jakarta Mega Trans. Jurnal Manajemen Bisnis Transportasi Dan Logistik, 1(3), 459–480.

Nurdiansyah, I., Wicaksono, A., & Bowoputro, H. (2015). Kajian Kinerja Operasional Kereta Api Jenggala Jurusan Mojokerto – Sidoarjo. Jurnal Mahasiswa Jurusan Teknik Sipil, 1(3), 1379-1389.

Saidah, D. (2017). Kualitas Pelayanan Commuter Line. Jurnal Manajemen Transportasi dan Logistik, 4(1), 51–58.

Sumantri, B.R., & Herijanto, W. (2014). Analisis Kinerja Operasional Kereta Api Sriwedari Ekspress Jurusan Solo-Yogya. Jurnal Teknik POMITS, 3(1), 1–6.

Tamin, O. Z. (1997). Perencanaan dan Pemodelan Transportasi. Bandung: ITB.

Taufik, M.R., Mutmainah, N., & Tamara, A. K. (2019). Pengaruh Jadwal Sandar dan Keberangkatan Kapal Terhadap Kualitas Pelayanan Kapal. Jurnal Manajemen Bisnis Transportasi Dan Logistik, 5(5), 403–408.

Vuchic, V. R. (1981). Urban Public Transportation System and Technology. Philadelphia: University of Pensylvania.

Warpani, S. P. (2002). Pengelolaan Lalu Lintas dan Angkutan Jalan. Bandung: ITB.

Wibowo, A., Wicaksono, A., & Djakfar, L. (2015). Kinerja Waktu Tempuh Kereta Api Segmen Bojonegoro-Kandangan. Jurnal Transportasi, 15(3), 189–198.

Downloads

Published

2020-12-09

How to Cite

Hastuti, U. J., Hidayat, M., & Firdaus, M. I. (2020). Ketepatan Waktu dan Okupansi Terhadap Kinerja Kereta Api Joglosemarkerto. Jurnal Manajemen Bisnis Transportasi Dan Logistik, 6(2), 107–114. https://doi.org/10.54324/j.mbtl.v6i2.522

Issue

Section

Articles

Similar Articles

<< < 6 7 8 9 10 11 12 13 14 15 > >> 

You may also start an advanced similarity search for this article.