PENYEBAB KETERLAMBATAN KEGIATAN PENGADAAN IMPOR BARANG LOGISTIK HIGH DAMPING RUBBER BEARING
DOI:
https://doi.org/10.54324/j.mbtl.v1i3.971Keywords:
procurement, High Damping Rubber Bearing (HDRB), and fishbone diagramAbstract
PT. Wijaya Karya (Persero) Tbk is a construction company that has 6 subsidiaries and 10 operating departments. In conducting its business, the company is applying sourcing materials locally and internationally. One of them is the procurement of goods imported High Damping Rubber Bearings (HDRB) that serves as the foundation of anti-earthquake building structures and cannot be produced inside the country. Using a causal diagram (fishbone diagram; Dr. Kaoru Ishikawa), it was found that the factors causing delays in goods (HDRB) is due to production machinery, human resources, time, method, and money.References
Badan Pusat Statistik; Statistik Indonesia, Jakarta, 2013.
___Berita Resmi Statistik No. 17/03/Th. XVI/1 Maret 2013 proyeksi ekspor impor di Indonesia
Gasperz, Vincent. Sistem Manajemen Kinerja Terintegrasi Balanced Scored Card Dengan Six Sigma untuk Organisasi Bisnis dan Pemerintah, PT Gramedia Pustaka Utama, Jakarta, 2006.
Herjanto, Eddy. Manajemen Operasi. Jakarta: Grasindo, 2007.
Hasibuan, Malayu S.P. Manajemen Sumber Daya Manusia Edisi Revisi, Bumi Aksara. 2003.
Manullang, M, Dasar-Dasar Manajemen, Yogyakarta: Ghalia, 2000.
Purnomo, Agus; Diktat Supply Chain Management, 2004;60-61, Bab SCM
Riduwan, Dasar-dasar Statistika, Alfa Beta, Bandung 2009
Sugiyono, Metode Penelitian Kuantitatif Kualitatif dan R&D, Alfabeta, Bandung, 2011.
Suyono Capt.R.P., Shipping Pengangkutan Intermodal Ekspor Impor Melalui Laut, Jakarta, Penerbit PPM, 2003.

