THE EFFECT OF FLIGHT OPERATION COMMERCIAL AND TECHNICAL DELAY ON ON-TIME PERFORMANCE OF PT GARUDA INDONESIA
DOI:
https://doi.org/10.54324/j.mbtl.v4i3.825Keywords:
flight operation, commercial, technical, delay, on-time performance.Abstract
PT Garuda Indonesia is a state-owned enterprise that run business in commercial air transport industry. The purpose of this paper was to examine the effect of delay Flight Operation, Commercial, and Technical On On-time Performance. To obtain that purpose, writer used analysis method of Classic Assumption Test (Multicollinearity, Autocorrelation, Heteroscedasticity, Linearity), Simple Linear and Multivariate Linear regression, correlation coefficient, coefficient of determination, and hypothesis test. The analysis shown that all independent variable is obtained BLUE criteria and could be used as good estimator for next discussion. Multivariate regression equation is Y = 98,481 – 0,039X1 – 0,016X2 – 0,006X3 means that every increase of X1 (Flight Operation delay), X2 (Commercial delay), and X3 (Technical delay) will impact to the change of Y variable (On-time Performance) at the level of 0,039, 0,016, and 0,006 unit of count and at 98,481 intercept point. Correlation coefficient (r) at 0,846 represent strong correlation between variables. Coefficient of determination at 71,6%. From the hypothesis test, it shown that F result (26,910) >F Table (2,90), means that H0 is rejected and H1 is accepted, means there is a correlation between X1, X2, and X3 toward Y variable (On-time Performance) simultantly in PT Garuda Indonesia year2014-2016.References
Abbas Salim. (2013). Manajemen Transportasi. Jakarta: Rajawali Pers.
Abdelghany, Ahmed & Abdelghany, Khaled. (2009). Modeling Applications in the
Airline Industry. Farnham: Ashgate Publishing Limited.
Afsar, H. Murat; Espinouse, Marie-Laure; Penz, Bernard. (2009). Building flight planning for an airline company under maintenance constraints. Journal of Quality in Maintenance Engineering, Vol. 15 Issue: 4 pp.430-443
doi: 10.1108/13552510910997788
Bazargan, Massoud. (2016). Airline maintenance strategies – in-house vs. outsourced
– an optimization approach. Journal of Quality in Maintenance Engineering, Vol. 22 Issue: 2, pp.114-129.
doi: 10.1108/JQME-08-2015-0038
Belobaba, P., Odoni, A., & Barnhart, C. (2009). The Global Airline Industry.
Chichester: John Wiley & Sons, Ltd.
Bodie, Z., Kane, A., Marcus, A.J. (2009). Investment, 8th Edition, New York: McGraw-Hill
Bowersox, Donald J., Closs, David J., Cooper, M. Bixby. (2002). Supply Chain Logistic Management. New York: The McGraw-Hill Companies, Inc.
Castro, Antonio J. M.; Rocha, Ana Paula; Oliveira, Eugenio. (2014). A New Approach for Disruption Management in Airline Operations. Studies in Computational Intelligence; Volume 562. Springer-Verlag Berlin Heidelberg
Cathay Pacific. (2016). Company Annual Report
Coyle, John J., Novack, Robert A., Gibson, Brian J., & Bardi, Edward J. (2011).
Transportation: A Supply Chain Perspective. Ohio: South-Western Cengage Learning.
Garuda Indonesia. (2015). Company Annual Report.
—————— (2007). On-time Performance Improvement Program.
—————— (2015). Operation Control Centre Annual Report.
International Air Transport Association. (2009). Airport Handling Manual AHM730.
—————— (2016). Reference Manual for Audit Programs. Japan
Kamus Populer Transportasi dan Logistik. (2012). Jakarta: Erlangga.
Kotler, P., Armstrong, G. (2016). Principles of Marketing: Global Edition Harlow: Pearson Educational Limited.
Kotler, P., Keller, K.L. (2016). A Framework for Marketing Management: Global Edition. Harlow: Pearson Educational Limited.
Nasution, M. Nur. (2010). Manajemen Transportasi. Bogor: Ghalia Indonesia. Niehues, A., Belin, S., Hansson, T., Hauser, R., Mostajo, M., & Richter, J. (2001).
Punctuality: How Airlines Can Improve On-time Performance. Booz-Allen & Hamilton.
Marisha Nur Fitriyana. (2016). Pengaruh Contribution Technical Delay terhadap On Time Performance pada Penerbangan PT Garuda Indonesia oleh PT GMF AeroAsia di Bandara Soekarno-Hatta Tangerang Banten Periode Juli- Desember 2015 (Skripsi is not published). Sekolah Tinggi Manajemen Transportasi Trisakti.
On-time Performance Service Awards. (2017). accesed at flightstats.com/company/media/on-time-performance award/2016-on-time- performance-service-award-data/
Robbins, S.P., & Coulter, M. (2009). Management. New Jersey: Prentice Hall.
—————— (2012). Management. New Jersey: Prentice Hall.
Shaw; S. (2007). Airline Marketing and Management. Aldershot: Ashgate Publishing Limited.
Sofjan Assauri. (2008). Manajemen Produksi dan Operasi, Edisi Revisi. Jakarta: LPFEUI
Supranto, J., (2009). Statistik Teori dan Aplikasi. Jakarta: Erlangga.
Theo Arischandra (2014). Analisis Hubungan Lalu Lintas Udara terhadap On Time Performance PT Garuda Indonesia di Bandar Udara Soekarno-Hatta Tahun 2012-2013 ( Skripsi is not published). Sekolah Tinggi Manajemen Transportasi Trisakti.
The Republic of Indonesia’s Civil Aviation Safety Regulation part 121; accessed at hubud.dephub.go.id/?en/dsku/download/7004
The Republic of Indonesia’s Law number 1 Year 2009 on Aviation; accessed at hubud.dephub.go.id/?id/uu/download/5
The Republic of Indonesia’s Transportation Minister Decree number 89 Year 2015 on Delay Management in Scheduled Commercial Air Carrier; accessed at hubud.dephub.go.id/?en/kepmen/download/896
Tri Kartika Yustari. (2010). Analisis Pengaruh Variabel Makroekonomi terhadap Return Saham Pertambangan yang Terdaftar di BEI Periode Januari 1999- Desember 2009 dengan Menggunakan Multifactor Model (Post-graduate Thesis). Universitas Indonesia.
Wensveen, J.G. (2011). Air Transportation A Management Perspective. Farnham: Ashgate Publishing Limited.
Wu, C.L. (2010). Airline Operation and Delay Management. Farnham: Ashgate Publishing Limited.

