Perancangan Ulang Tata Letak Fasilitas Internal Warehouse Untuk Meminimasi Ongkos Material Handling

Penulis

  • Adinda Bela Patria Sebelas Maret University
  • Muhammad Hisjam Sebelas Maret University

DOI:

https://doi.org/10.54324/j.mtl.v8i2.568

Kata Kunci:

warehouse layout, material handling cost, activity relationship chart

Abstrak

Warehouse of Company X has two production supply destinations, TFD 315 and TFD 500. One of the supply destinations has a high workload for the forklift driver. It happened because of the long distance when doing material handling. Warehouse’s layout of company X is not optimal that causing huge material handling costs. So, relayout of the facilities is done in order to reduce material handling costs by shortening the distance between facilities based on the relationship of material handling activities.  The stages of this research are data collection, calculating distance and material handling costs for the initial facility layout, making the activity relationship chart (ARC) between facilities, planning the new facility layout, then calculating the distance and cost of material handling of the new layout, and the last is comparing the initial and the new material handling costs. The results of this research is that after doing relayout of warehouse facility layout, material handling costs are reduced by 21.07% from the initial cost.

Referensi

Apple, J.M. (1990). Tata Letak Pabrik dan Pemindahan Bahan (3rd Edition). Bandung: Institut Teknologi Bandung.

Eko, S. R. (2010). Perancangan Ulang Tata Letak Fasilitas Produksi di CV. Dimas Rotan Gatak Sukoharjo. [Skripsi]. Surakarta: Program Studi Teknik Industri Fakultas Teknik Universitas Sebelas Maret.

Harjono, R., & Prasetyawan, Y. (2010). Perancangan Tata Letak Gudang untuk Meminimumkan Jumlah Produk yang Tidak Tertampung dalam Blok dan Efisiensi Aktivitas Perpindahan Barang di Divisi Penyimpanan Produk Jadi PT. ISM Bogasari Flour Mills Surabaya. ITS Library, http://digilib.its.ac.id/public/ITS-Undergraduate-12612-Paper.pdf.

Johan, J., & Suhada, K. (2018). Usulan Perancangan Tata Letak Gudang dengan Menggunakan Metode Class-Based Storage (Studi Kasus di PT Heksatex Indah, Cimahi Selatan). Journal of Integrated System, 1(1), 52–71. https://doi.org/10.28932/jis.v1i1.989

Muslim, D., & Ilmaniati, A. (2018). Usulan Perbaikan Tata Letak Fasilitas Terhadap Optimalisasi Jarak dan Ongkos Material Handling Dengan Pendekatan Systematic Layout Planning (SLP) di PT Transplant Indonesia. Jurnal Media Teknik Dan Sistem Industri, 2(1), 45. https://doi.org/10.35194/jmtsi.v2i1.327

Purnomo, H. (2004). Perencanaan & Perancangan Fasilitas. Yogyakarta: Penerbit Graha Ilmu.

Ristono, A. (2006). Perancangan Tata Letak Fleksibel Dengan Teori Graph. Jurnal Teknik Industri, 8(1), 28–39. https://doi.org/10.9744/jti.8.1.pp.28-39

Safitri, N. D., Ilmi, Z., & Amin, M. (2018). Analisis Perancangan Tataletak Fasilitas Produksi Menggunakan Metode Activity Relationship Chart (ARC). Jurnal Manajemen, 9(1), 38. https://doi.org/10.29264/jmmn.v9i1.2431

Tompkins, J.A., White, J.A., Bozer, Y.A., & Tanchoco, J.M. (2003). Facilities Planning. United States of America: John Wiley & Sons, Inc.

Wignjosoebroto, S. (2003). Tata Letak Pabrik dan Pemindahan Bahan. Surabaya: Guna Widya.

Diterbitkan

2022-08-30

Terbitan

Bagian

Articles