Seleksi Sub-Kontraktor Proyek Konstruksi Jalan Layang
DOI:
https://doi.org/10.54324/j.mtl.v5i1.213Kata Kunci:
fly over, sub-contractor selection, ANPAbstrak
The aim of the study is to measure the selection criteria of sub-contractor fly over construction project and to level the sub-contractors based on five criteria which are financial factor, practical factor, managerial, safety, and company’s image. The right sub-contractor as partner is the important factor for main contractor in building the fly over based on the schedule and the budget with good quality. The study was using ANP (analytic network process) to evaluate the criteria interrelation of main contractor when making decisions of uncertainty situation to be better. The subject of the study is the Tendean-Blok M-Cileduk fly over construction project. The result shows that sub-contractor A has the highest result of 0.4798, sub-contractor B with 0.3646 and the last is sub-contractor C with 0.1556.Referensi
Badan Pusat Statistik. (2017). Indikator Konstruksi Triwulan II. Jakarta: Badan Pusat Statistik.
Budiarti, S., & Widodo, A. (2013). Pengambilan keputusan multi-kriteria menggunakan metode ANP (Analytical Network Process) pada evaluasi supplier. Jurnal Mahasiswa Matematika, 1(4),288-291.
Elanchezhian, C., Ramnath, B. V., & Kesavan, R. (2010). Vendor evaluation using multi criteria decision making technique. International Journal of Computer Applications, 5(9), 4-9.
Ervianto, W. (2002). Manajemen Proyek Konstruksi. Yogyakarta: Andi Offset.
Fuady, M. (1998). Kontrak Pemborongan Mega Proyek. Bandung: Citra Aditya Bakti.
Henrico, &Soekiman, A. (2013). Analisa perilaku kontraktor utama dalam melakukan subkontrak kontruksi bangunan gedung di Indonesia. Jurnal Konstruksia,5(1), 33-48.
Ho, W., Xu, X., & Dey, P.K. (2010). Multi-criteria decision making approaches for supplier evaluation and selection: A literature review. European Journal of Operational Research, 202(1), 16-24. doi:10.1016/j.ejor.2009.05.009
Iriani, Y.,& Herawan, T. (2012). Pemilihan supplier bahan baku benang dengan menggunakan metode analytic network process (ANP) (Studi kasus home industry nedy). Simposium Nasional RAPI XI FT UMS – 2012. Solo.
Kementerian Pekerjaan Umum Republik Indonesia. (2007). Peraturan Menteri Pekerjaan Umum Nomor 43/ PRT/ M/ 2007 tentang Standar dan Pedoman Pengadaan Jasa Konstruksi. Diakses dari http://birohukum.pu.go.id/uploads/DPU/2007/Permen43-2007.pdf 1 Januari 2017
Kurniawan, R., Hasibuan, S., & Nugroho, R.E. (2017). Analisis kriteria dan proses seleksi kontraktor chemical sektor hulu migas: Aplikasi metode Delphi – AHP. Jurnal Ilmiah Manajemen, 7(2), 252-266.
Lavelle, D., Hendry, J., & Steel, G. (2007). The selection of subcontractors: Is price the major factor? Proceedings of the 23rd Annual Association of Researchers in Construction Management (ARCOM), 65-73.
Lin, R., Lin, J.J., Shu, C.J., Diodes, T., Chao, H., Peter, J.C. (2008). Note on group consistency in analytic hierarchy process. European Journal of Operational Research, 190(3), 627–678.
Messah, Y. A., Pono, R.D.R., & Krisnayanti, D.S. (2012). Kajian kriteria pemilihan subkontraktor oleh kontraktor utama menggunakan metode analytic hierarchy process (AHP) [The study of selecting the subcontractor criteria by the main contractors using analytic hierarchy process (AHP)]. Dinamika Teknik Sipil, 12(1), 94-100.
Presiden Republik Indonesia. (2010). Peraturan Presiden Republik Indonesia Nomor 54 Tahun 2010 tentang Pengadaan Barang/ Jasa Pemerintah. Diakses dari www.bpkp.go.id/uu/filedownload/5/4/1853.bpkp 1 Januari 2017
Saaty, T. L. (2005). Theory and applications of the analytic network process. Pittsburgh, PA: RWS.
Saaty, T. L. (2008).Decision making with the analytic hierarchy process.International Journal of Services Sciences, 1(1), 83-98.
Shiau, Y-C., Tsai, T-P., Wang, W-C., & Huang, M-L.(2002). Use questionnaire and AHP techniques to develop subcontractor selection system. Proceedings of the 19th International Symposium on Automation and Robotics in Construction (ISARC), 35-40. doi: 10.22260/ISARC2002/0006
Shemshadi, A., Toreihi, M., Shirazi, H., & Tarokh, M. J. (2011). Supplier selection based on supplier risk: An ANP and fuzzy TOPSIS approach. The Journal of Mathematics and Computer Science, 2(1), 111-121.
Shemshadi, A., Shirazi, H., Toreihi, M., & Tarokh, M.J. (2011). A fuzzy VIKOR method for supplier selection based on entropy measure for objective weighting. Expert Systems with Applications, 38(10), 12160-12167.
Tahriri, F., Osman, M. R., Ali, A., Yusuff, R. M., & Esfandiary, A. (2008). AHP approach for supplier evaluation and selection in a steel manufacturing company. Journal of Industrial Engineering and Management, 1(2), 54-76. doi:10.3926/jiem.2008.v1n2.p54-76
Wu, T., Shunk, D., Blackhurst, J., & Appalla, R. (2007). AIDEA: A methodology for supplier evaluation and selection in a supplier-based manufacturing environment. International Journal of Technology and Management, 11(2), 174-192.
Yulianti, M. (2013). Penerapan metode analytic network process (ANP) dan technique for order preference by similarity to ideal solution (TOPSIS) dalam pemilihan supplier (Studi kasus PT Industri Telekomunikasi Indonesia, Bandung) (Skripsi tidak terpublikasi). Universitas Pendidikan Indonesia, Bandung, Indonesia.
Unduhan
Diterbitkan
Terbitan
Bagian
Lisensi
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).