Analisis Program Evaluation Review Technique (Pert) terhadap Waktu Bongkar Muat Kendaraan

Authors

  • Silvia Dewi Kumalasari Institut Transportasi dan Logistik Trisakti
  • Wiwit prihartono Institut Transportasi dan Logistik Trisakti
  • Danang Darunanto Institut Transportasi dan Logistik Trisakti

DOI:

https://doi.org/10.54324/j.mbtl.v5i3.816

Keywords:

PERT, Stowage plan, critical path, optimal time, card yard

Abstract

The increasing need for vehicles brings up several problems for loading and unloadingcompanies due to the dominance of cargo vehicles in the car yards, the increasing cargotraffic inside the port every year, the tardiness of export documents from the Shipper / EMKLowners and the increasing intense competition of similar business fields on the same location.By using Evaluation Review Technique Program / PERT , the researchers would like to findout the process of loading and unloadingvehicle , the factors that influence the time forloading and unloading vehicle and the optimal time in scheduling loading and unloadingvehicle. The results show that the time for loading and unloading vehicle is carried out within22:25:00 25 minutes and the critical path at 21:40:00. The factors that influence the length ofloading and unloading vehicle are (a) Delay in providing export documents, (b) Simplesystem for making stowage plan documents, (c) Lack of Human Resources in the process ofloading and unloading vehicles. The optimal time that can be taken is 14:00:00 withopportunities based on a normal table of 0.99988, which means that there is a chance of99.99% of the process loading and unloading vehicles can be completed in the optimal time.

References

Heizer Jay, & Barry, R. (2005). Operations Management. Jakarta: Salemba Empat.

Iskandar Abubakar, Herdjan Kenasin, Wiratno, B. B. (2013). Transportasi Penyebrangan, Suatu Pengantar (Satu). Jakarta: PT. Rajagrafindo Persada.

Koleangan, D. (2008). Sistem Petikemas.

Lynna, P., & Syafriudin. (2005). Aplikasi Microsoft Project untuk Penjadwalan Kerja Teknik Sipil. Jakarta.

Suyono. (2007). Pengangkutan Intermodal Ekspor Impor Melalui Laut (Empat). Jakarta: PPM.

Downloads

Published

2019-05-29

How to Cite

Kumalasari, S. D., prihartono, W., & Darunanto, D. (2019). Analisis Program Evaluation Review Technique (Pert) terhadap Waktu Bongkar Muat Kendaraan. Jurnal Manajemen Bisnis Transportasi Dan Logistik, 5(3), 381–390. https://doi.org/10.54324/j.mbtl.v5i3.816

Issue

Section

Articles

Similar Articles

1 2 3 4 5 6 7 8 9 > >> 

You may also start an advanced similarity search for this article.